
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1135		1		88
1125		2		104
1110		3		112
1100		4		126
1084		5		132
1073		7		146
1059		8		149
1058		9		155
1052		10		163
1046		11		167
1025		12		173
1020		13		187
1006		14		225
1000		15		775
999		16		778
996		17		807
995		18		811
985		19		828
983		20		830
973		21		831
970		22		836
968		24		10897
966		23		10899
965		23		10901
963		23		10902
961		25		10904
959		28		12913
952		28		16920
949		29		16922
945		31		17186
940		30		17188
935		29		17189
922		32		26202
921		32		28206
918		33		29209
917		32		65263
913		32		65267
912		36		80304
909		35		87322
908		36		87326
906		37		87329
901		37		87333
897		38		87338
895		36		87343
894		38		87351

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 40
number of demands   : 342
first solution time : 3
optimization time   : 180535
initial max maxLinkLoad    : 1138
final max maxLinkLoad      : 894
number of tunnels   : 38
pre-optimization max link utilization 1.1387072250583332
post-optimization max link utilization 0.8950229243166667
2 demands over 342 (0.5847953216374269%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.565008117
