
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
952		1		123
939		2		167
938		3		258
926		4		265
922		5		272
905		6		306
898		7		331
889		8		335
883		9		4028
879		10		5031
873		11		7035
868		12		7036
861		13		7038
850		15		7039
849		16		7061
836		17		7190
834		17		10537
833		20		12541
822		21		14544
818		24		16699
809		25		16701
807		24		17703
806		27		17804
802		26		19806
801		25		19807
799		26		19808
793		27		24141
791		26		32150
788		26		44169
787		25		77204

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 32
number of demands   : 210
first solution time : 3
optimization time   : 180339
initial max maxLinkLoad    : 957
final max maxLinkLoad      : 787
number of tunnels   : 25
pre-optimization max link utilization 0.9579824587333333
post-optimization max link utilization 0.7881293662333334
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.354823845
