
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
963		1		122
955		4		417
946		5		450
938		6		455
930		8		481
914		9		493
912		11		511
905		11		518
902		12		521
887		13		562
884		11		564
883		13		576
879		16		1062
877		17		1064
867		16		1065
861		17		1139
847		18		1140
843		20		1503
836		21		3439
829		22		3440
825		22		6588
822		22		7309
820		23		9313
811		23		9348
809		26		15354
800		25		17357
798		23		21519
796		22		21521
791		23		21523
790		22		21524
785		22		21525

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 32
number of demands   : 210
first solution time : 3
optimization time   : 180686
initial max maxLinkLoad    : 983
final max maxLinkLoad      : 785
number of tunnels   : 22
pre-optimization max link utilization 0.9842536332000001
post-optimization max link utilization 0.7862262969333335
2 demands over 210 (0.9523809523809523%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.701082573
