
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
835		1		75
780		2		82
765		3		86

Optimization completed
----------------------
number of nodes     : 11
number of edges     : 36
number of demands   : 110
first solution time : 2
optimization time   : 180943
initial max maxLinkLoad    : 866
final max maxLinkLoad      : 765
number of tunnels   : 3
pre-optimization max link utilization 0.8662012684
post-optimization max link utilization 0.7658308568666667
1 demands over 110 (0.9090909090909091%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.960230411
