
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
876		1		91
872		2		105
824		3		110
822		4		113
817		5		117

Optimization completed
----------------------
number of nodes     : 11
number of edges     : 36
number of demands   : 110
first solution time : 2
optimization time   : 180354
initial max maxLinkLoad    : 912
final max maxLinkLoad      : 817
number of tunnels   : 5
pre-optimization max link utilization 0.9129391784777778
post-optimization max link utilization 0.8179476346666668
2 demands over 110 (1.8181818181818181%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.370214051
