
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
879		1		82
839		2		88
808		3		91
800		4		100
782		5		103

Optimization completed
----------------------
number of nodes     : 11
number of edges     : 36
number of demands   : 110
first solution time : 2
optimization time   : 180064
initial max maxLinkLoad    : 884
final max maxLinkLoad      : 782
number of tunnels   : 5
pre-optimization max link utilization 0.8844393873666665
post-optimization max link utilization 0.7826615577333332
1 demands over 110 (0.9090909090909091%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.081390763
