
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
869		1		80
867		2		88
844		3		92
840		4		115
812		4		119
810		6		607
805		7		628
803		8		645
799		10		649
795		9		711
794		11		716
791		12		723
787		11		730

Optimization completed
----------------------
number of nodes     : 11
number of edges     : 36
number of demands   : 110
first solution time : 2
optimization time   : 180948
initial max maxLinkLoad    : 911
final max maxLinkLoad      : 787
number of tunnels   : 11
pre-optimization max link utilization 0.9115104952611112
post-optimization max link utilization 0.7882166634
1 demands over 110 (0.9090909090909091%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.964468342
