
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1063		1		101
1061		2		108
1053		3		119
1043		4		123
1039		5		127
1032		6		157
1021		7		164
1019		8		168
1010		9		188
1008		10		201
1000		11		204
997		12		207
990		13		233
986		14		245
975		15		248
968		16		250
964		17		252
952		18		320
943		19		322
941		20		324
932		22		409
930		23		556
921		24		563
919		25		565
911		26		572
909		27		585
901		28		715
899		30		720
895		31		763
894		33		795
893		33		802

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 2
optimization time   : 180057
initial max maxLinkLoad    : 1071
final max maxLinkLoad      : 893
number of tunnels   : 33
pre-optimization max link utilization 1.071624350092857
post-optimization max link utilization 0.8941063410999999
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.070575972
