
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1044		1		95
1033		2		106
1023		3		110
1000		4		114
989		5		117
986		6		121
975		7		124
967		8		127
956		9		129
953		10		133
945		11		135
935		13		152
934		14		217
924		15		219
923		16		227
915		17		230
912		18		237
906		19		240
901		20		249
900		22		278
896		23		280
895		25		293
893		25		295
892		27		574
891		31		1459
890		33		1544
888		33		1547
885		34		1552
884		36		1650
883		38		1687
882		41		16663
881		41		18668
880		47		24240

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 3
optimization time   : 180565
initial max maxLinkLoad    : 1055
final max maxLinkLoad      : 880
number of tunnels   : 47
pre-optimization max link utilization 1.0562057752142857
post-optimization max link utilization 0.881248430092857
7 demands over 380 (1.8421052631578947%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.579764984
