
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1037		1		90
1026		2		102
1015		3		124
1014		4		129
1005		5		134
993		6		155
982		7		158
972		8		168
962		9		172
951		11		180
940		12		186
939		13		220
938		15		270
929		16		272
927		17		455
919		18		485
918		18		518
917		20		662
916		21		665
909		22		675
907		23		1999
904		23		2000
902		24		2001
901		24		2002
899		25		2003
898		25		2005
891		26		2006
890		28		2016
888		29		2068
887		30		2119
882		30		3369
879		31		3370
877		31		3371
876		31		3906
875		32		17808
872		34		17812
871		34		17814
870		36		17918

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 7
optimization time   : 180242
initial max maxLinkLoad    : 1048
final max maxLinkLoad      : 870
number of tunnels   : 36
pre-optimization max link utilization 1.048931508242857
post-optimization max link utilization 0.8711646456571429
4 demands over 380 (1.0526315789473684%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.261975801
