
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1058		1		145
1036		2		156
1027		3		167
1016		4		175
1014		5		179
1005		6		184
994		7		191
992		8		194
984		9		198
982		10		202
975		11		207
971		12		210
964		13		214
960		14		216
953		15		222
949		16		225
942		17		232
938		18		237
931		19		247
928		20		249
922		21		251
917		22		294
913		23		296
906		24		326
904		25		329
903		25		337
901		26		378
900		27		381
899		29		386
893		30		392
891		31		394
889		32		399
888		34		475

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 4
optimization time   : 180687
initial max maxLinkLoad    : 1069
final max maxLinkLoad      : 888
number of tunnels   : 34
pre-optimization max link utilization 1.0699093645214286
post-optimization max link utilization 0.8890836180999999
4 demands over 380 (1.0526315789473684%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.70066543
