
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1060		1		91
1049		2		101
1043		3		107
1038		4		111
1033		5		114
1027		6		117
1022		7		122
1016		8		125
1011		9		128
1000		10		133
994		11		137
991		12		142
972		13		151
968		14		156
950		15		160
947		16		162
935		17		165
928		18		168
923		20		194
921		20		270
919		21		6578
910		23		6593
908		28		7597
906		28		7600
905		30		7602
902		33		7609
900		33		7683
898		36		8594
896		36		8663
895		37		8668
894		38		8880
892		39		8882
891		39		8883
890		39		9386

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 2
optimization time   : 180917
initial max maxLinkLoad    : 1070
final max maxLinkLoad      : 890
number of tunnels   : 40
pre-optimization max link utilization 1.0708669064285714
post-optimization max link utilization 0.89096622305
3 demands over 380 (0.7894736842105263%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.928405642
