
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1008		1		76
1005		2		84
986		3		88
983		4		91
972		5		94
964		6		97
949		7		102
943		8		104
927		9		108
923		10		112
916		11		116
912		12		124
910		13		132
903		14		138
899		15		150
892		17		153
889		17		227
880		19		274
879		21		2342
878		25		2652
876		25		3265
871		26		3266
870		26		3267
869		29		3273
868		30		3306
865		31		3333
864		29		3334
857		30		3334
856		32		3342
855		42		51859
854		44		51969
852		45		51975
850		45		51977
849		53		58864
848		54		58868
847		54		108956
846		56		109132

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 40
number of demands   : 380
first solution time : 3
optimization time   : 180209
initial max maxLinkLoad    : 1016
final max maxLinkLoad      : 846
number of tunnels   : 55
pre-optimization max link utilization 1.016495298207143
post-optimization max link utilization 0.8472236581785715
13 demands over 380 (3.4210526315789473%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.220723732
