
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
592		1		90
591		2		95
587		3		100
585		4		104
580		5		118
571		6		121
569		7		123
564		8		127
563		9		130
561		10		131
557		11		134
547		12		136
542		13		138
539		14		140
537		15		142
533		15		143
532		17		148
531		18		150
524		19		153
522		20		155
519		21		157
518		21		168
516		23		172
515		24		173
513		24		174
509		25		176
507		26		177
504		27		1069
503		28		1071
502		29		1074
500		30		1076
499		39		9087

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180362
initial max maxLinkLoad    : 621
final max maxLinkLoad      : 499
number of tunnels   : 40
pre-optimization max link utilization 0.6213946801899999
post-optimization max link utilization 0.49948691319
2 demands over 380 (0.5263157894736842%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.374196843
