
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
615		1		64
611		2		71
609		3		75
599		4		81
590		5		85
589		5		90
586		6		92
585		7		95
584		8		97
583		9		99
575		10		101
573		11		103
563		13		127
559		14		134
554		15		136
553		16		138
552		17		140
549		18		142
543		20		146
542		21		148
541		21		164
538		22		167
537		23		173
536		23		175
533		24		176
531		25		178
530		26		194
528		27		196
527		26		197
525		28		58615
524		31		58620
523		32		58622
522		39		66656
520		43		66660
519		47		66667
518		46		66669
517		48		66672
516		50		66678
515		58		66687
513		56		66690

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180809
initial max maxLinkLoad    : 638
final max maxLinkLoad      : 513
number of tunnels   : 56
pre-optimization max link utilization 0.638396987495
post-optimization max link utilization 0.51360935834
6 demands over 380 (1.5789473684210527%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.823841737
