
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
620		1		64
606		2		71
596		4		81
589		4		85
585		5		88
581		6		90
576		7		96
569		9		100
559		10		102
557		10		104
555		12		118
554		13		120
552		13		121
549		14		125
546		14		126
545		15		127
543		16		157
542		17		159
541		18		160
539		19		163
538		21		165
535		22		167
534		26		44410
533		27		44414
532		26		44417
531		27		51427
530		27		51433
529		32		52457
526		36		59474
525		37		59476
524		38		59478
523		36		59480
522		36		59482
521		35		59489
520		37		59495
517		36		59498

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180623
initial max maxLinkLoad    : 635
final max maxLinkLoad      : 517
number of tunnels   : 36
pre-optimization max link utilization 0.636145886115
post-optimization max link utilization 0.51756694046
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.637823405
