
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
662		1		91
641		2		100
639		3		105
629		4		110
616		5		116
614		6		123
613		7		126
610		8		130
597		9		139
587		10		141
586		11		145
582		12		152
579		13		158
577		14		161
573		15		163
572		16		164
567		16		166
558		17		167
556		18		169
554		19		170
552		21		834
550		22		835
549		24		8916
548		25		8918
547		25		8920
545		26		8921
543		31		9001

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180556
initial max maxLinkLoad    : 690
final max maxLinkLoad      : 543
number of tunnels   : 31
pre-optimization max link utilization 0.690906690505
post-optimization max link utilization 0.54346382
4 demands over 380 (1.0526315789473684%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.569051493
