
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
599		1		65
597		2		73
593		3		77
581		4		81
578		5		88
568		6		91
567		8		3490
564		9		3493
562		10		3494
561		11		3496
558		12		3497
557		13		3498
556		14		3499
555		14		62932

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180075
initial max maxLinkLoad    : 612
final max maxLinkLoad      : 555
number of tunnels   : 15
pre-optimization max link utilization 0.61245547446
post-optimization max link utilization 0.55540153818
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.086594988
