
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
589		1		68
587		2		74
584		3		77
574		4		81
569		5		84
564		6		91
559		7		95
558		8		1549
556		9		1552
553		10		1554
551		11		1555
550		11		1556
549		12		1560
545		14		3167
543		15		3169
542		19		60295
540		21		60299
539		22		60302
537		23		60306
536		24		60311
535		25		60314
534		28		60318
532		28		60321
531		29		60323
529		30		60326
526		30		78346

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180451
initial max maxLinkLoad    : 596
final max maxLinkLoad      : 526
number of tunnels   : 30
pre-optimization max link utilization 0.59658714645
post-optimization max link utilization 0.5269053213999999
3 demands over 380 (0.7894736842105263%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.463185987
