
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
586		1		74
579		2		80
578		3		83
568		4		87
567		5		90
564		6		94
559		7		97
555		8		100
550		9		104
548		11		111
543		12		151
541		13		154
539		14		156
534		15		159
533		17		163
531		17		164
530		18		165
527		19		166
526		19		54554
524		24		64124

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180245
initial max maxLinkLoad    : 591
final max maxLinkLoad      : 524
number of tunnels   : 24
pre-optimization max link utilization 0.5915605453599999
post-optimization max link utilization 0.52504742265
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.259625061
